SL.NO |
Project Code |
Description |
Client/End User |
Year of Award |
Status |
1. |
J22688 |
Rehabilitation of 132/13.8KV MISFALA SS and MANSOURA SS in MAKKAH Area |
NGSA-WEST / AL-OJAIMI |
May 2022 |
Ongoing |
2. |
J22683 |
Design & Engineering for Half Moon and EL Dhahiyah project |
SEC EOA / AL-TOUKHI |
Jan 2022 |
Ongoing |
3. |
J22682 |
Construction of Saudi-Egypt HVDC ± 500kV Link (Madinah & Tabuk Converter Station, Aqaba Transition Station & Associated Remote Ends) |
SEC WOA / SSEM |
Jan 2022 |
Ongoing |
4. |
J22681 |
Reinforcement of (9037 & 9040) to add Reactors |
SEC COA / AL-OJAIMI |
Jan 2022 |
Ongoing |
5. |
J22680 |
Expansion of the Exisitng M-Q MID (9033) |
SEC COA / AL-OJAIMI |
Jan 2022 |
Ongoing |
6. |
J22679 |
Reinforcement of 380KV BSPs 9024 & 9009 & 9019 for Installation of Reactors |
SEC COA / NCC |
Jan 2022 |
Ongoing |
7. |
J21678 |
Construction of New Diriyah Gate 380/132kV BSP & Reinforcement of Hitheen BSP#9005 and Salboukh BSP# 9018 |
SEC COA / SSEM |
Dec 2021 |
Ongoing |
8. |
J21677 |
Construction of 132/13.8kV substation # 8387, 8388, 8389 & 8390 for King salman park project in Riyadh area |
NGSA / NESMA |
Nov 2021 |
Ongoing |
9. |
J21676 |
Construction of 132kV Gantry compound of Bay AD23 at Tabuk BSP |
NGSA / SIEMENS |
Nov 2021 |
Completed |
10. |
J21663 |
Expansion of Existing LAYLA BSP for installation of Reactor |
SEC COA / NCC |
Apr 2021 |
Completed |
11. |
J21659 |
Construction of 132/13.8kv SS#8383 AND Expansion of SS#8183 & 8184 |
NGSA-COA/SIEMENS |
Mar 2021 |
Completed |
12. |
J21660 |
Construction of 380/132/13.8KV BSP#9075 ROSHN DEVELOPMENT COMPANY |
SEC COA / SIEMENS |
Mar 2021 |
Completed |
13. |
J21656 |
Reinforcement of 380KV BSP MAKKAH & SISSED for 380KV BUS REACTOR INSTALLATION |
SEC COA / AL-TOUKHI |
Feb 2021 |
Completed |
14. |
J21655 |
Reinfrocement of 380KV BSPs#9038(ESHBEILIAH) and #9048(FAL) for installation of Reactors |
SEC COA / NCC |
Feb 2021 |
Completed |
15. |
J21653 |
Reinforcement of 380KV BSP JDNW, SANABL &KAU for 380KV BUS REACTOR INSTALLATION |
SEC SOA / AL-OJAIMI |
Jan 2021 |
Completed |
16. |
J21654 |
Reinforcement of 380kV BSPs#9054 (METRO STATION), #9042 (AR RAEED), #9089 (AIRPORT NORTH) for installation of Reactors |
SEC WOA / NCC |
Jan 2021 |
Completed |
17. |
J21653 |
Installation of (2) 380kV, 60MVAR Bus Conneted Reactor at WADI AL DAWASIR BSP |
SEC COA / AL-TOUKHI |
Jan 2021 |
Completed |
18. |
J20652 |
Expansion of Existing NAMERAH NORTH BSP for Installation of Reactors & Expansion of Existing MUHAYEL WEST BSP for installation of Reactors |
SEC WOA / AL-TOUKHI |
Dec 2020 |
Completed |
19. |
J20633 |
Construction of 380kV OHTL Double Ckt between SWPC 3A S/S to Jubail Residential/Juymah BSP |
SWPC/NCC/CEPCO-III |
Aug 2020 |
Completed |
20. |
J20646 |
Expansion of MADAIN BSP (NEW REACTOR) - NWA |
SEC WOA / NCC |
Aug 2020 |
Completed |
21. |
J20636 |
Construction of one (1) 380kV D/C OHTL between DHUBA Green P/P and Al WAJH (WJH) BSP |
SEC-WOA/NCC |
Mar 2020 |
Completed |
22. |
J20638 |
Construction of New Al Aseelh (ASL) 380/132/13.8KV BSP |
SEC WOA / NCC |
Mar 2020 |
Ongoing |
23. |
J20632 |
Expansion of Exisiting NAMERAH NORTH 380/132kV BSP (SOA) |
SEC WOA / NCC |
Feb 2020 |
Completed |
24. |
J20637 |
380kv & 132kV OHTL Interconnections of Layla |
SEC-COA/NCC |
Jan 2020 |
Completed |
25. |
J20630 |
Raising of The Overhead Power Transmission Lines at Roads (T8 & T12) and Railway Crossing. |
RC/NCC |
Jan 2020 |
Ongoing |
26. |
J20624 |
Construction of 132kV D/C OHTL for Power Supply to Baish West 132/13.8kV S/S in Jizan With Network |
SEC-SOA/NCC |
Jan 2020 |
Completed |
27. |
J20625 |
Construction of 132kV D/C OHTL for Power Supply to Wadi Bin Hashbal 132/33kV S/S in ASIR With Network |
SEC-SOA/NCC |
Jan 2020 |
Ongoing |
28. |
J20626 |
Construction of 132kV D/C OHTL for Supply to Farsha 132/33kV S/S in ASIR with Network |
SEC-SOA/NCC |
Jan 2020 |
Ongoing |
29. |
J19610 |
Modification of Ghunan Fadhili 400kV OHTL |
GCCIA/NCC |
Dec 2019 |
Completed |
30. |
J19605 |
Construction of 13.8kV RMU facility and water utility system in Ras Tanura. |
SEC EOA / CPP |
Oct 2019 |
Completed |
31. |
J19604 |
Power Supply to SHEDGUM GOSP-6 and UTHMANIYAH GOSP-11 & UTHMANIYAH GOSP-12 |
SEC EOA / L&T |
Sep 2019 |
Completed |
32. |
J19615 |
400kV OHTL Survey works for Kuwait-Iraq Interconnection Project |
MEW/NCC |
Aug 2019 |
Completed |
33. |
J19601 |
Replacement of Existing Outdoor UTHMANIYAH P/P 115kV SUBSTATION |
SEC EOA / L&T |
Aug 2019 |
Completed |
34. |
J19597 |
Installation of 380kV Line Reactors for HAIL 2 - AL JOUF OHTL at HAIL 2 (BSP 9031) and 380kV, 120MVAR Line Reactor at HAIL-1 (9030) BSP |
SEC EOA / NCC |
Jul 2019 |
Completed |
35. |
J19590 |
Construction of Expansion of SHEDGUM-2 380/115kV BSP |
RC Yanbu / SIEMENS |
May 2019 |
Completed |
36. |
J19592 |
380/115/34.5 kV NEW BSP 16P (SS16P) |
RC Yanbu / SIEMENS |
May 2019 |
Completed |
37. |
J19591 |
Construction of Expansion of JUBAIL 380/230kV BSP |
SEC COA / NCC |
Apr 2019 |
Completed |
38. |
J19613 |
Construction of one (1) 380kV D/C OHTL between Arar BSP to Waad Shamaal BSP |
SEC-COA/FAEC |
May 2019 |
Completed |
39. |
J19612 |
Power Supply to Aramco Jizan Economic City Phase-1 132/13.8Kvsubstation- Installation of Double Ckt 132kV UGC from JEC(MRSS) to JEC Phase-1 – 10.5KM |
SEC-SOA/NCC |
Mar 2019 |
Completed |
40. |
J19614 |
Construction of two (2) 380kV DC OHTL between JRP-FRA (CKT-1), JEC-FRA (CKT-1) and FRA-ABHE (CKT-1&2) |
SEC-SOA/NCC |
Mar 2019 |
Completed |
41. |
J19581 |
Haradh & Hawiyah Field Gas compression project - 69kV and 230kV - 9Nos SS |
SEC EOA / NCC |
Jan 2019 |
Completed |
42. |
J18579 |
Construction of New Al Remal BSP#9046 380/132/13.8kV |
SEC COA / AL-BATAIN |
Dec 2018 |
Completed |
43. |
J18559 |
KFUPM 115/13.8KV SUBSTATION |
SEC EOA / NCC |
Sep 2018 |
Completed |
44. |
J18563 |
HARADH 380/230KV BSP & Expansion of HAWIYAH 380KV BSP |
SEC EOA / NCC |
Jun 2018 |
Completed |
45. |
J17539 |
132kV OHTL Reconductoring SHUQAIQ TO PSA2 |
Saline Water Conversion Corporation / NCC |
Oct 2017 |
Completed |
46. |
J17529 |
Electrical, Instrumentation, Telecommunication works, Rabigh-II, refining & Petrochemical Project |
SAIPEM / NCC |
May 2017 |
Completed |
47. |
J17527 |
Preparation of Shop Drawings for Riyadh Metro Line 4, 5 & 6 |
Riyadh Advanced Metro Project Execution and Delivery / TDC |
Apr 2017 |
Completed |
48. |
J16512 |
Short Circuit Study for Riyadh metro 9051 BSP |
SEC / NCC |
Mar 2016 |
Completed |
49. |
J16503 |
Construction of Dhahran ownership - 380/115/13.8kV BSP and New Dhahran Central BSP 230/69kV |
SEC / NCC |
Feb 2016 |
Completed |
50. |
J016-2015 |
132kV S/C & D/C OHTL - Foundation Designs Mokhtrah 132/33/13.8kV BSP TO Madaya 380/132/13.8kV Substation, Jizan -KSA South |
NG / NCC |
Oct 2015 |
Completed |
51. |
J008-2015 |
115/13.8kV 4B SS in 2nd Dammam Industrial Estate |
NG / NCC |
Jun 2015 |
Completed |
52. |
J007-2015 |
AL-JOUF 2 BSP – AR’AR BSP 380kV D/C OHTL - Foundation Designs - AL JOUF & ARAR |
RC / NCC |
Apr 2015 |
Completed |
53. |
J034-2014 |
115kV OHTL Modification at Jubail Industrial City- Monopole Foundation Designs - ROYAL COMMISSION |
NG / NCC |
Dec 2014 |
Completed |
54. |
J031-2014 |
115kV D/C OHTL (Aindar/Hawiyah Areas) - Tower Designs & GA drawing – SAOO |
SEC / NCC |
Nov 2014 |
Completed |
55. |
J025-2014 |
380kV DC OHTL From S/S 9023 (PP-10) To S/S 9067 Al Kharaj- Tower Spotting & Foundation Designs – MODON |
SEC /NCC |
Jul 2014 |
Completed |
56. |
J016-2014 |
Doha 380/230/115/13.8kV - 3D Architectural View |
SEC / NCC |
May 2014 |
Completed |
57. |
J003-2013 |
Construction of Juaymah 380/230/13.8kV BSP |
SEC / NCC |
Feb 2014 |
Completed |
58. |
J006-2014 |
132kV OHTL - Power Supply to Khalidiyah-2 132/13.8kV S/S - Tower Spotting & Foundation Designs - Khalidiyah |
SEC / NCC |
Jan 2014 |
Completed |
59. |
J008-2014 |
132kV OHTL - Qunfudah North 132/13.8kV S/S Tihama - Foundation Design |
SEC / NCC |
Jan 2014 |
Completed |
SL.NO |
Project Code |
Description |
Client/End User |
Year of Award |
Status |
1. |
J18557 |
Primary Design Engineering Services for 132/11kV Keranola Substation |
GE Grid Solutions/ DEWA |
Apr 2018 |
Ongoing |
2. |
J18555 |
External Static Pressure Calculation (ESP) for MEP Services, Dubai Hills Mall Area -1, 2 & 3 |
ARMA Elektropanc |
Mar 2018 |
Ongoing |
3. |
J18553 |
132kV Cable Laying works for towers of KIFAF (TWRKIFAF) 132/11kV Substation |
NCC/ DEWA |
Feb 2018 |
Ongoing |
4. |
J18552 |
Review and validation of Design of 33kV OHL, associated Tie-ins & Cabling works at ADNOC Bab Integrated Facilities Project |
NCC/ China Petroleum / ADNOC |
Feb 2018 |
Ongoing |
5. |
J18551 |
400kV SC Gantry Design for Hassyan Clean Coal Power Plant - Phase 1 |
NCC/ DEWA |
Feb 2018 |
Completed |
6. |
J18548 |
132kV SS Shakhbout City, OHL 400kV OHL Connection Tane - Bahia |
NCC/ TRANSCO |
Jan 2017 |
Ongoing |
7. |
J18547 |
Design Verification & Load comparison for Modification of Existing 5nos. 400kV SET Type Towers in MUSHWRSN OHL Circuit to MUSH-HSTA OHL Circuit |
Centaur Electro Mech. Contracting Co. LLC/ DEWA |
Jan 2018 |
Ongoing |
8. |
J18542 |
132kV Gantry & Equipment Support Structure Design for 132/33/11/6.6kV GIS SS |
GE Grid Solutions/ Ministry of Electricity |
Dec 2017 |
Completed |
9. |
J18558 |
132/11kV School Substation & 132/11kV Tilal Al Ghaf Substation, Dubai |
NCC/ DEWA |
Nov 2017 |
Ongoing |
10. |
J17528 |
Modification of Existing MUSH-WRSN 132kV & 400kv OHTL Circuit to MUSH-HSTA OHTL Circuit-ERS |
NCC/ DEWA |
May 2017 |
Ongoing |
11. |
J17521 |
Design & Engineering Services of 400kV Gantry Structure for 400kV OHL Modification Works for 400kV Series Reactor Station between DREP & GSTA-DEWA Project |
NCC / DEWA |
Jan 2017 |
Completed |
12. |
J16517 |
EPC for Al Dabbiya Surface Facilities Phase III - Construction Access Road to Island |
NCC / ADCO |
Oct 2016 |
Completed |
13. |
J16510 |
Insulation, Co-ordination Study for Al Dabbiya |
NCC / ADCO, UAE |
Apr 2016 |
Completed |
14. |
J16501-2 |
Detail Engineering for Diesel Fuel Line, Diluge, Hydrant, AirLine, Water Line Works for Switch gear upgrade project |
CAE / ADGAS - ADMA |
Jan 2016 |
Completed |
15. |
J16501-1 |
Detail engineering for Switchgear Upgrade Project |
CAE / ADGAS - ADMA |
Jan 2016 |
Completed |
16. |
J029-2014 |
Review of 66kV OHL and Associated Switchgear - Alrar Inlet Separation and Boosting Facilities- Algeria |
PETROFAC / SONATRACH |
Sep 2014 |
Completed |
17. |
J015-2014 |
Engineering Services for RCC Building - Alrar Inlet Separation and Boosting Facilities- Algeria |
PETROFAC / SONATRACH |
Apr 2014 |
Completed |
18. |
J013-2014 |
Pile Foundation Design for 33kV OHL Bab Habshan Development Project |
NCC / ADCO |
Mar 2014 |
Completed |
19. |
J004-2013 |
400kV OHL works for Shamka Grid Station – Pile Design |
NCC / TRANSCO |
Nov 2013 |
Completed |
20. |
J001-2014 |
Bab Habshan 1, Review of 33kV OHL, Design & Foundation / Routing |
PETROFAC / ADCO |
Nov 2013 |
Completed |
SL.NO |
Project Code |
Description |
Client/End User |
Year of Award |
Status |
1. |
J18546 |
Design of 220 kV & 30 kV Lattice Towers, Fioundation, GA drawings & Shop drawings transmission line Kigoma to Rwanda/Burundi border (Interconnetions Project) -Rwanda |
NCC / Rwanda Energy Group (REG). |
Jan 2018 |
Ongoing |
2. |
J17541 |
Design services for NIPP Lot 20-3 Abakaliki-Ikom-Obudu132 kV Transmission Line Project-Nigeria |
GRACEHILL ENERGY NIGERIA LTD / Transmission Company of Nigeria(TCN). |
Dec 2017 |
Ongoing |
3. |
J17538 |
Design Of MUTUNDWE - ENTEBBE 132 kV Transmission Line from Mutundwe to Entebbe- Uganda |
NCC / Uganda Electricity Transmission Company Limited (UETCL) |
Nov 2017 |
Ongoing |
4. |
J17536 |
Design of Foundation for all Tower - Cote d'Ivoire-Liberia-Sierra Leone-Guinea Interconnection Project (CLSG) |
NCC / TRANSCO |
Oct 2017 |
Ongoing |
5. |
J17525 |
Engineering Services for Civil, Structural, Fire Fighting & HVAC Design in New MA'AN 400/132 kV Substation & extension of 400/132kV Qatranah and 132/33kV SS - Jordan |
NCC / NEPCO |
Mar 2017 |
Ongoing |
6. |
J16511 |
132 kV S/C OHTL from HYDE Park S/S TO Glenville S/S via Cowdray Park S/S Tower Spotting & Foundation Design – Zimbabwe |
PME / ZETDC |
Jul 2016 |
Completed |
7. |
J014-2015 |
400kV OHL- Tower Spotting, Tower & Foundation Designs, Tower Spotting, for Construction of 400/220 kV Isinya, Athi river and Nairobi North Substation Extensions-Kenya |
NCC / KETRACO |
Jun 2015 |
Completed |
8. |
J009-2015 |
33/11kV Distribution OHL - Lot-4 - Pole Foundation Design, Tanzania |
NCC / TANSECO |
Apr 2015 |
Completed |
9. |
J003-2015 |
132kV DC OHTL in Dar Es Salaam, Arusha & Kilimanjaro - Tower & Foundation Designs and Creek crossing- Tanzania |
NCC / TANSECO |
Mar 2015 |
Completed |
10. |
J002-2015 |
Power System Study for 400/220kV SS, Isinya & 220/66kV SS, Nairobi North, Kenya |
NCC / KETRACO |
Feb 2015 |
Completed |
11. |
J035-2014 |
Civil & Structural Design for 400/220kV Isinya & 220/66kV Nairobi North SS- Kenya |
NCC / KETRACO |
Dec 2014 |
Completed |
12. |
J030-2014 |
30kV OHTL Lines and Service Connections, EDCL-EARP, RWANDA - Load Calculations of Poles & Foundation- Rwanda |
NCC / EDCL |
Oct 2014 |
Completed |
13. |
J028-2014 |
Preparation of Cable Schedules for 7 Lots - 220/60kV SS and 60/30kV SS, Algeria |
NCC / GRTE |
Sep 2014 |
Completed |
14. |
J014-2014 |
220/66/33kV SS- Mozambique |
NCC / EM |
Apr 2014 |
Completed |
15. |
J012-2014 |
132kV S/C Monopole Foundation Designs, Figtree to Chibambo S/S Zambia |
NCC / ZESCO |
Mar 2014 |
Completed |
16. |
J002-2013 |
60/30kV Iflissen Outdoor SS - Algeria |
NCC / GRTE |
Oct 2013 |
Completed |
17. |
J001-2013 |
60/30kV El Eulma Nord Outdoor SS - Algeria |
NCC / GRTE |
Oct 2013 |
Completed |
SL.NO |
Project Code |
Description |
Client/End User |
Year of Award |
Status |
1. |
J18556 |
66/11kV New Salata Substation (Replacement) & 66/11kV New Doha E Substation (Replacement) |
Galfar / KAHRAMAA |
Apr 2018 |
Ongoing |
2. |
J17537 |
Best & Betas 132/11kV Substations |
BEST & BETAS / KAHRAMAA |
Sep 2017 |
Ongoing |
3. |
J17523 |
Qatar Power Transmission Expansion Phase - 1. Stage 1, Package C-15, C-16 & C-18 - (1 Cable route) |
NCC / KAHRAMAA |
Feb 2017 |
Ongoing |
4. |
J16518 |
Qatar Power Transmission Expansion Phase - 1. Stage 1, Package C-15 & C-16 - (1 Cable route) |
NCC / KAHRAMAA |
Nov 2016 |
Completed |
5. |
J16515 |
Ph-12 – Underground Cabling Design for 220/132/33kV, 132/11 & 66/11 kV (6 routes) |
NCC / KAHRAMAA |
Aug 2016 |
Completed |
6. |
J16504 |
Qatar Power Transmission Sytem Expansion Phase - 11, Package S13 & S14 - 5 Cable routes |
NCC / KAHRAMAA |
Mar 2016 |
Completed |
7. |
J021-2015 |
GTC/643/2014 - Qatar Power Transmission System Expansion Phase-12, 23 Substations. S10, S12, S13, S14, S15 Packages |
NCC / KAHRAMAA |
Dec 2015 |
Completed |
8. |
J015-2015 |
Qatar Power Transmission System Expansion - Phase 11 - Package C-18 , 3 Cable route |
NCC / KAHRAMAA |
Jun 2015 |
Completed |
9. |
J012-2015 |
Qatar Power Transmission System Expansion - Phase 11 - Package C-18 , 3 Cable route |
NCC / KAHRAMAA |
May 2015 |
Completed |
10. |
J019-2014 |
Qatar Power Transmission System Expansion Phase-11, S13, S14 Package – 15 Substations |
NCC / KAHRAMAA |
Feb 2015 |
Completed |
11. |
J011-2015 |
Qatar Power Transmission System Expansion Phase - 11, Package C15, C16 - 1 Cable route |
NCC / KAHRAMAA |
Jan 2015 |
Completed |
12. |
J018-2014 |
Establishment of 66kV Rayyan Village S/S and Upgrade of Existing S/S Power Cables |
NCC / KAHRAMAA |
Jun 2014 |
Completed |
13. |
J017-2014 |
Qatar Power Transmission System Expansion - Phase 11 - Stage 1, C-15 & C16 (6 Cable Routes) |
NCC / KAHRAMAA |
May 2014 |
Completed |
14. |
J027-2014 |
Diversion of 66kV Power Cable to Facilitate Qatar Rail Works |
NCC / KAHRAMAA |
May 2014 |
Completed |
SL.NO |
Project Code |
Description |
Client/End User |
Year of Award |
Status |
1. |
J18561 |
400 kV D/C OHTL, Xeldam- Narendra for Goa Project - Goa Project |
STERLITE POWER GRID VENTURES LIMITED (SPGVL) |
May 2018 |
Ongoing |
2. |
J18560 |
Earthing Design for 66/11kV SS for (Adani-Wilmar) Hazira Project and 220/33kV GIS & Transformer Yard for IOCL Gujarat Refinery Project |
Voltech Engineers Pvt. Ltd / Indian Oil Corporation Limited |
May 2018 |
Ongoing |
3. |
J18554 |
New Intermediate towers Design of 400/132 KV MCMV Tower types MB, MC & MD for NERSS -IIB and V Project. |
STERLITE (SPGVL) |
Mar 2018 |
Ongoing |
4. |
J18550 |
Design Engineering Review and approval for 400/132kV PK Bari & Surajmaninagar Substation at Tripura. |
STERLITE (SPGVL) |
Feb 2018 |
Ongoing |
5. |
J18549 |
400 kV D/C OHTL, Xeldam- Narendra for Goa Project , DA/DB Tower Design for Goa Project (WZ-1) |
STERLITE (SPGVL) |
Feb 2018 |
Completed |
6. |
J18544 |
Design of 400/132 KV MCMV Tower for NERSS -IIB and V Project. Higher Extn. Tower type MD 18/25/30 m BE |
STERLITE (SPGVL) |
Dec 2017 |
Completed |
7. |
J18543 |
Design & Engineering works (Indoor) for 110kV GIS Substation Project at SAKI RS Telegana, India |
TATA POWER / TOSHIBA |
Dec 2017 |
Ongoing |
8. |
J17540 |
Design of MB & MC Towers for 400kV (Twin Moose) & 132KV (Single HTLS) M/C T/L (WZ - 6) for NER 2B & 5 |
STERLITE (SPGVL) |
Dec 2017 |
Completed |
9. |
J17535 |
TANTRANSCO, Chennai - 400kV Double Circuit Transmission Line - Design Of Steel Monopole Foundations |
TAMILNADU TRANSMISSION CORPORATION LIMITED / NCC |
Aug 2017 |
Completed |
10. |
J17534 |
Earthing design for 1.2 MT PA Mini Mill at Sohar. |
SHRIRAM EPC / MOON IRON STEEL CO |
Jul 2017 |
Completed |
11. |
J17533 |
Preparation of OHL Parameters |
STERLITE POWER / OPTCL |
Jul 2017 |
Completed |
12. |
J17530 |
Design of MA & MD Towers for 400kV (Twin Moose) & 132KV (Single HTLS) M/C T/L (WZ - 6) for NER 2B & 5 |
PGCIL / STERLITE |
Jul 2017 |
Ongoing |
13. |
J17532 |
Review of 400/220 kV GIS at Kadarpur / Sohana road / Prithala |
PGCIL / STERLITE |
Jul 2017 |
Ongoing |
14. |
J16516 |
Civil Design of Equipment support structures for Transformer package at Cuddappah SS |
PGCIL / TOSHIBA |
Aug 2016 |
Completed |
15. |
J16514 |
Construction of 220/33kV GIS, Keonjhar, Odisha |
PGCIL / TOSHIBA |
Jul 2016 |
Completed |
16. |
J019-2015 |
Preparation of BoQ & As-Built for 220/132kV GIS Substation at Mokokchung, Nagaland & 132kV GIS Substation at, Melriat Mizoram |
PGCIL / HYOSUNG |
Dec 2015 |
Completed |
17. |
J013-2015 |
Engineering services for 220/132kV GIS Substation at Mokokchung, Nagaland & 132kV GIS Substation at, Melriat Mizoram |
PGCIL / HYOSUNG |
Dec 2015 |
Completed |
18. |
J026-2014 |
Design and Engineering of control room building, Bokaro Steel Plant |
SAIL / GE |
Jul 2014 |
Completed |
19. |
J17524 |
Design & Engineering for 400kV GIS Substation at Chandwa, Jharkhand |
PGCIL / HYOSUNG |
Mar 2014 |
Completed |